“this time of year” is 100% christmas.
from people putting up lights, probably trying to run remote power to a box with an extension cord, or because they installed half their lights backward and need this to bridge between the two sets because they rather embrace the danger than redo all the work.
Treczoks@lemmy.world 10 months ago
A former coworker was abroad most of the time. Still, his power meter showed lots of usage during his absence. A tenant in the same house had used such a cord to leech power across the common laundry room.
Now that coworker knew his way about electricity. So instead of the 220V between common and a phase, he rewired his washing machine socket to two different phases, aka 380V, and left for a week.
When he came back, he saw a number of kitchen- and other appliances waiting for trash collection.
FourWaveforms@lemm.ee 10 months ago
3 phase going to a house?
Treczoks@lemmy.world 10 months ago
Absolutely normal here. Three phases, now 400 instead of 380V back then, 64A. Standard house connection.