We need to ditch cloud entirety and go in house again.
For many many companies that would be returning to the bad-old-days.
I don’t miss getting an emergency page during the Thanksgiving meal because there’s excessive temperature being reported in the in-house datacenter. Going into the office and finding the CRAC failed and its now 105 degree F. And you knew the CRAC preventive maintenance was overdue and management wouldn’t approve the cost to get it serviced even though you’ve been asking for it for more than 6 months. You also know with this high temp event, you’re going to have an increased rate of hard drive failures over the next year.
No thank you.
rumba@lemmy.zip 3 weeks ago
I certainly don’t miss dealing with air conditioning, dry fire protection, and redundant internet connections.
I also don’t miss trying to deal with aging servers out and bringing new hardware in.
dubyakay@lemmy.ca 3 weeks ago
That work is still being done by someone in a data centre. But all these jobs went from in-house positions to the centres.
partial_accumen@lemmy.world 3 weeks ago
The difference is scale. When in-house, the person responsible for managing the glycol loop is also responsible for the other CRACs, possibly the power rails, and likely the fire suppression. In a giant provider, each one of those is its own team with dozens or hundreds of people that specialize in only their area. They can spend 100% on their one area of responsibilty instead of having to wear multiple hats. The small the company, the more hats people have to wear, and the worse to overall result is because of being spread to thin.