Yep – US also doesn’t generally do residential three-phase unlike many countries in the EU. A lot of garages around here have 3x16A 230V, not (only) due to the power requirements but because having three phases allows for simplest induction motors for things like blowers and circular saws. When you have three phases having a proper outlet in the garage starts making sense.
Around here (Finland more specifically) we have three-phase even in most apartments. My two bedroom apartment has a 3x25A main breaker, and two devices on 3x16A circuit’s – the sauna stove and oven+stovetop. Most single-family homes have 3x25A or 3x36A as well.
US households are missing out on a lot of things due to their split-phase system.
IsoKiero@sopuli.xyz 1 week ago
In here 100+ year old houses are pretty common but practically all of them still have at least somewhat up to date electrics with that 3-phase input. It’s been around for decades after all. My house is built originally 1928 and my mothers house is from 1909 and both of them have 3x25A main breakers with those 380V 16A CEE sockets around.
And as garages commonly double as a work space with 3-phase induction motors on the tools it’s still pretty common to have that 3x16A available as it’s not that much more expensive to pull 5x2.5mm² cable to the garage compared to 3x2.5mm² for single phase 16A outlet.
antimidas@sopuli.xyz 1 week ago
Also, it’s typically not that expensive to upgrade your panel, if you live in a zoned area. Buildings in the unzoned area typically have good electrical connections since in the countryside you typically want access to three phases.
As an example for moving from older single phase service to 3x25A, it costs around 810 € typically, with 2000-3000 € as a worst case scenario. That’s in Lahti, Finland – in Espoo it seems to be around 500 €