No, the problem is they engineered something they didn’t need to, because Musk thinks everything should be electric because it’s cool. They had to then engineer a mechanical release, because it was required by law (for good reason)
Mechanical door locks would have been cheaper. The fly by wire in the cyber truck is far more expensive, heavier, and far more dangerous than the very well polished power steering systems every other car uses
Maybe it’s something like they wanted to make more money on repairs or something… But even that they could’ve done better by starting from very common, cheap technology
Let’s be clear… The real problem here is that Elon Musk, opinion having idiot that he is, made decisions from on high with very little understanding of engineering
HiTekRedNek@lemmy.world 8 months ago
By your logic then, capitalism is great, because that means no one would’ve engineered these crazy locks but instead just used the tried and true ones.
Wait. That’s not what happened?
Oh.
ZMonster@lemmy.world 8 months ago
I would joke that since they don’t work then I doubt any engineering went into them at all. But I know that isn’t true.
So I wonder if you could elaborate on what you mean by “crazy locks”? I did a lot of work investigating the manufacturing equipment and their use, so I remember a bit about their components, design, and assembly; but I did not work with those directly so I could be missing something entirely. I don’t remember there being anything groundbreaking about the mechanics of the door locks. But the general build always felt… “thinner”. Most manufacturers stay away from minimum standards by at least the standard deviation or two, so if the required gauge was 18 ± 1, a typical mfr would use 20+. Tesla would use 18. On the nose. That was a lot more common in automotive but even hyundai/kia used wide margins for safety. All that to say, I have a hard time believing the door locks were so complex that a sizable investment would be anything other than reinventing the wheel, but even moreso that it was even worth the superfluous cost.
One of the last jobs I had there was a machine that they picked up third hand and cobbled together with some very sketchy safety systems that wildly failed requirements. I was there for days and it was one of the more extensive reports I’ve ever made on a single installation. The control system was designed by the onsite engineers and passed flawlessly. But they had a lot to do to get the equipment usable.
lemming741@lemmy.world 8 months ago
I stopped reading when you suggested 20 gauge was heavier than 18 gauge.
Rookie mistake you can’t come back from.
ZMonster@lemmy.world 8 months ago
Lol, I saw that after I sent it, but was absolutely not confident enough to change it. I don’t work in that field any more so that is not the only thing about materials that you probably know better than me. And I’m sorry for the wall of text. My bad.