Comment on How did we get humans on the moon in 1969 and are still struggling to get the Starship rocket to launch properly?

<- View Parent
Bimfred@lemmy.world ⁨6⁩ ⁨months⁩ ago

Is it? Starship has been in development since at least 2012-ish (as the “mars colonial transport” or “its” or “bfr” or a few other names). It hasn’t done a succesful mission yet. ULA’s Vulcan was anounced in 2014, and it works just fine. So I don’t really think it’s actually faster or better, but it IS more showy.

The first time Starship was spoken of was in 2012, yes. The very first idealistic designs of it. The design that’s actually being tested is from 2018. So 5 years to go from “Alright, this is what we’re gonna do” to full stack flight testing. Roughly on pace with their previous rockets, the Falcon 1 and Falcon 9 took about 4 years.

Absolute and complete lie. Its exactly the opposite. SpaceX did not, and still DOES NOT have a solid design or mockup of HLS. Dynetics and Blue Origin had both.

Blue Origin had (and still has) no experience with human-rated capsules. The Dynetics lander had a negative mass margin. It was literally too heavy to do the job it was proposed for. Meanwhile, SpaceX proposed a derivative of what they were already working on.

The problem is that SpaceX had a bid at the same level of the others, but they lowered it when Kathy Lueders gave them a call (and not the other parties) to lower it. This is spelled out in NASA’s own document:

SpaceX’s bid was just under 3B. Blue Origin bid at a bit under 6B. Dynetics wanted 9B. This information is freely available online. SpaceX was also given the least in design development funding, with 135 million versus Blue’s 579 million and Dynetics’ 253 million. It’s not terribly shocking that a company with a good track record and the lowest bid wins a contract.

No, the contract stated that anything between zero and three were options, based on funding. They said the goal was two, but then budget was reduced. Nobody was told this. The number of contracts was also reduced to one as a result. Nobody was told this. And then Kathy Lueders gave SpaceX a call, and not the others, to share this information.

They needed a lander contract. And when the budget got cut, they negotiated with the one bidder who was deemed most likely to still get the job done with the lower budget, as opposed to the other two whose bids were wildly over what NASA could give them. SpaceX bid at 2.94 billion and the final award was 2.89 billion. Again, BO bid 6 billion and Dynetics bid 9 billion.

source