Comment on TIL the cost of transporting energy around

absGeekNZ@lemmy.nz ⁨2⁩ ⁨weeks⁩ ago

I don’t get why materials for HVDC are so much higher than everything else. Towers and cables are relatively cheap, the substation hardware is not, but neither are pumping stations with all of the safety requirements.

Also why only 500kV when there are 1.2MV systems in the world. Not that it would make much difference since the bulk of the cost is down to materials.

I didn’t see the amortisation time in my quick skim through.

I know in NZ the compliance cost to get a pipeline through would kill any project that tried to do this.

Obviously leaks etc are ignored in this model, but they at a significant contributor to climate change.

original
Sort:hotnewtop