There are grid connection delays of 8 to 10 years for lots of renewable energy projects, as the grid wasnt designed to have many small inputs, so its not like there arent issues there too, and thats before you start getting into reliability issues once the percentage of non-dispatachable energy gets higher.
In general both need to be invested in heavily, and structural reforms done, if we have a chance of actually meeting climate goals. Thankfully that seems to be the plan.
HumanPenguin@feddit.uk 1 day ago
Sorry no. France has proven the case for nuclear as a business many times over.
And for all the benefits of renewable. It has one huge disadvantage. We cannot control availability. So either storage (takes more space then the UK has. Or harmful materials for battery’s. Or some form of power plant that can be turned on or of with demand.
Nuclear is by far the cleanest that meets that goal. Until STEP is proven at large scale. (We are now building a full size fusion plant so post 2040 that looks likely).
It really is the best option.