Comment on Boat work update.
HumanPenguin@feddit.uk 3 weeks agoMost of the stuff is together. (obtained wise) Mounting etc is a big part of the 3d printer. But likely after the engine room.
The smaller pie is planned to manage the solar dump. along with a diesal air to water heater (Bobil Van) Linked in but only temp shut off via the pie.
All the mounting etc comes after the bilge and engin electronics.
Likely early 26 for finisjh iven our mobility. ]
Thanks for remembering