So long, Intel.
Intel announces cancellation of 20A process node for Arrow Lake, goes with external nodes instead, likely TSMC
Submitted 2 months ago by Alphane_Moon@lemmy.world to technology@lemmy.world
Comments
solrize@lemmy.world 2 months ago
Alphane_Moon@lemmy.world 2 months ago
That would not be a good thing. The CPU/GPU design and semiconductor fab industries are already massively concentrated.
wewbull@feddit.uk 2 months ago
Agreed, It wouldn’t be a good thing. However it’s their own failures and mismanagement that are causing it.
Mrkawfee@lemmy.world 2 months ago
The article says they’re instead putting their resources into manufacturing the 18A node process to save costs. Doesn’t sound like TSMC is a permanent solution.
Alphane_Moon@lemmy.world 2 months ago
No, TSMC is not supposed to be a permanent solution. Just Arrow Lake.